gadiri mohammed

Showing posts with label EAST WEST HIGHWAY: the stretch Boussidi Sidi (Sidi Bel Abbes) opened in Tlemcen. Show all posts
Showing posts with label EAST WEST HIGHWAY: the stretch Boussidi Sidi (Sidi Bel Abbes) opened in Tlemcen. Show all posts

Wednesday, September 08, 2010

EAST WEST HIGHWAY: the stretch Boussidi Sidi (Sidi Bel Abbes) opened in Tlemcen

EAST WEST HIGHWAY: the stretch Boussidi Sidi (Sidi Bel Abbes) opened in Tlemcen The stretch between Sidi Ali Boussidi located in the wilaya of Sidi Bel-Abbes, Tlemcen, west of the east, over 60 kilometers, was inaugurated Thursday, September 2, 2010 from the Minister Amar Ghoul public works in presence of Chinese Ambassador to Algeria Liu Yuhe, the Chinese company responsible for its implementation of the representative CETIC / CRCC; the head of the National Agency highway-ANA-, the local authorities. The Minister Ghoul said that "this highway completed in record time, and in accordance with international technical standards, extends over a length of 1,720 km, crossing bridges and 3000 including 200 large bridges, 14 tunnels for a total cost estimated at nearly 11 billion dollars. " Gadiri September 2, 2010